Design is underway for drainage, erosion and paving improvements for Mauk Branch Creek along Ferguson Lane to provide bank stabilization and slope protection. The design will also provide for improvements to the adjacent ditch and culvert on the west side of Ferguson Lane to capture stormwater runoff that may flow over Ferguson Lane and over the unprotected slope. The project limits are from the Ferguson Lane cul-de-sac southward for approximately 300 linear feet. These improvements are scheduled for construction in the summer of 2019. The engineer’s estimate of probable cost is $600,000.00.