Design is underway for grading and drainage improvements along Longworth Boulevard extending from West Camp Wisdom Road to Nature Drive. These improvements will provide for grading improvements to facilitate surface drainage on the southern side of Longworth Boulevard, including driveway reconstruction and culvert removal and/or replacement within the right-of-way, as necessary, from West Camp Wisdom to nature Drive. Construction of these improvements is scheduled for spring 2019. The Street Maintenance Division will perform this work in-house.

FY18 Drainage Improvements at Longworth Blvd.- Map