Last week, the contractor completed the installation of the 42” storm drain pipe east of Sunset Village Dr. for this traffic control phase and began installing the 8″ water line lowering on Bob Lee Blvd.

This week, the contractor will finish installing the water line lowering and complete the installation of the 60” storm drain pipes for this traffic control phase. They will also continue hauling off material from their staging area.

If they complete the installation of the 60” storm drain pipes, the traffic control will change on Monday. The next traffic control phase will be the closure of the left eastbound lane and with the right and middle lanes serving eastbound traffic.