Design of water and wastewater improvements is underway for West Center Street, the Center Ridge Apartment complex, and Center Ridge Drive. Installed in 1979, the existing water lines are 8-inch cast iron pipe and the wastewater lines are clay tile pipe. The project consists of 8-inch water main replacement of approximately 3,100 linear feet of along the current alignment of West Center Street from Cedar Ridge Drive to North Horne Street, approximately 2,800 linear feet along the current alignment of the existing 10-foot water line easement within the Center Ridge Apartment complex, and approximately 400 linear feet along Center Ridge Drive from Cedar Ridge Drive to the Center Ridge Apartment complex. The proposed wastewater improvements consist of approximately 2,500 linear feet of 8-inch wastewater main replacement along the current alignment of the existing six-foot sanitary sewer easement within the Center Ridge Apartment complex. The engineers probable cost of construction is $208,020.00. Construction is scheduled to start in summer 2019.

FY18 Water/Wastewater Improvements in W. Center Street- Map