Construction has been completed for the new sewer line on South Lodema Lane, Joe’s Drive, Tanco Lane, and a portion of Frank Keasler Boulevard, an area currently served by septic system.  The line was installed by open cut method and connects to the Lodema Lane project constructed last fiscal year.

Construction has also been completed for the water line improvements on Lodema Lane from Frank Keasler Boulevard south of IH-20, Joe’s Drive from Frank Keasler Boulevard south to IH-20, Tanco Lane from Lodema Lane east to North Duncanville Road, and Frank Keasler Boulevard from Joe’s Drive east to Lodema Lane.  Improvements include 1,890 linear feet of 8-inch water main replacement by open cut.   The water lines replaced were 61 years old and constructed with obsolete materials by today’s standards.

The water and wastewater improvements projects were completed in the summer of 2017.

There are no comments yet.

Leave a Reply